If a job is worth doing...
Here are a few photographs taken through 2008 and into Spring 2009, showing where more then 200 feet of new pine planking went.
Thorough examination and a fair amount of prodding and scraping had revealed very little soft timber in Caress’s hull, but there were a few cracked oak ribs and several sections of short pine planking where previous repairs had been carried out.
Decades of re-

We decided to opt for substantial and worthwhile improvements that would stand in good stead for years to come. Several new ribs were steamed from green oak; short sections of plank were replaced with full lengths to restore the original strength and spring. The plank joints were routered and then splined on flexible epoxy resin, the result after smoothing and sanding being a continuous unbroken surface providing the best paint adhesion.
All of the structural and aesthetic work was performed while the cabin sides were released from the decks and the keel and hog were carefully jacked and supported in the perfect position to retain the beautiful original sheerline so essential for her sailing quality.
Caress showing off her sheerline figure before being lifted to winter quarters. Isn’t she lovely? >>>